Betolovoto area · between Bansko and Razlog

Plots and houses at the foot of Pirin

Choose a plot and build a modern prefab house by Prefab Bulgaria – or a traditionally built house to your own design.

5 plots availableII, III, XII, XIII and XIV
Infrastructure in placeroad, power, water, sewerage, fibre internet
Move-in ready in up to 6 monthsfully finished prefab house
Energy class A+lower bills every winter

Plots with a house near Bansko and Razlog

Black Pine Villas is a gated residential complex in the Betolovoto area, between Bansko and Razlog, at the foot of the Pirin Mountains. Here you can buy a regulated building plot and build a house for permanent living, a second home or a holiday property.

The infrastructure is complete: lit asphalt streets, sewerage, water supply, electricity and fibre internet to every plot. You can build a modern prefab house by Prefab Bulgaria or a traditionally built house to your own design. There are currently 5 plots available.

Watch the video
Available plots

5 plots available at Black Pine Villas

Available plots are shown in blue on the interactive map. Select a plot on the map to see its status.

IIIIIXIIXIIIXIV
  • Regulated building plots (UPI), building density up to 30%
  • Lit asphalt streets to every plot
  • Sewerage, water supply, electricity and fibre internet
  • Own transformer station and wastewater treatment plant
  • Fence and video surveillance
Available plots

5 plots available at Black Pine Villas

Available plots are shown in blue on the interactive map. Select a plot on the map to see its status.

IIIIIXIIXIIIXIV
  • Regulated building plots (UPI), building density up to 30%
  • Lit asphalt streets to every plot
  • Sewerage, water supply, electricity and fibre internet
  • Own transformer station and wastewater treatment plant
  • Fence and video surveillance
The houses

Choose a model for your plot

Three ready-designed prefab houses by Prefab Bulgaria – fully move-in ready in up to 6 months.

Finish level

Standard

Finished structure, façade, windows and installations. You complete the interior to your taste.

Move-in ready

Comfort

Fully finished interior and bathrooms, built-in kitchen and furniture.

Move-in ready

Premium

High-end materials, heat pump, solid wood flooring and timber windows.

Why a prefab house

A prefab house is no compromise

Ready in up to 6 months

Factory production and on-site assembly in about 14 days.

Energy class A+

Factory insulation and minimal thermal bridges – lower bills.

German precision

WEINMANN production line – up to 90% of the house is finished before it reaches the site.

Predictable budget

Fixed price and a 10-year warranty.

Living in a pine forest, minutes from Bansko

The complex borders only on forest land where construction is not permitted – so the view and the quiet around your property will stay the same for years to come. Pirin National Park is nearby, and the Bansko ski area, Pirin Golf & Country Club and the mineral pools in Banya and Dobrinishte are within easy reach.

You get the calm of the mountains without compromising on comfort: own transformer station, own wastewater treatment plant, fence and video surveillance. The home is suitable for year-round use – skiing in winter, hiking, cycling and golf in summer.

No overdevelopment

The complex borders only on forest land where no building is allowed.

Bansko and Razlog nearby

Ski area, restaurants and everything you need – a short drive away.

Year-round activities

Skiing, golf, hiking, cycling and mineral pools in Banya and Dobrinishte.

Pirin on your doorstep

Pirin National Park and the trailhead to Yavorov Hut are nearby.

How it works

From plot to keys

  1. Plot and model

    You choose one of the 5 available plots and a house.

  2. Personal offer

    You receive an offer for the plot and house at your chosen finish level.

  3. Design and permit

    Surveying, geology and building permit.

  4. Foundation

    Built after the building permit is issued.

  5. Production and assembly

    The house is produced in the factory and assembled in about 14 days.

  6. Moving in

    The interior is finished to your chosen level.

From building permit to moving in – up to 6 months.Design and permit timelines depend on the authorities.

Only 5 plots left

Take the first step towards your home in Pirin

Choose a plot and a model – we will send you a personal offer and arrange a site visit.

Location